It’s not every day around here you see a house swinging in the air, but that’s what onlookers were treated to on 3rd Ave. NW in Slave Lake last week. Caitlin and Corey Staab’s new duplex went up in a big hurry, once the crane operators got everything squared away. The structure arrived on June 27 from the plant in Barrhead where it was manufactured, in two pieces. A large crane hoisted the two halves – one at a time – off the truck and swung them into position on the foundation. The operation drew quite a crowd of people – even one from out of town – for the free entertainment.