The upgrade to Slave Lake’s tennis courts was well underway last week. Pictured is a crew from the Mourad Group shoveling concrete into a hole that will contain pipes called ‘sleeves,’ The posts for the nets will be inserted into those sleeves. Operating the machine is owner Ziad Mourad. On the shovels are Armando and Logan.